The record // Minsawi Smart Mill
More oil. Half the crew.
Breakdown hours down 75%.
Minsawi Industries is a 41-year-old palm oil mill in Kuala Kangsar, Perak. From August 2024 we put our software on it, while it kept milling. The Star reported it as the world’s first palm oil mill to adopt AI.
The Star, 19 November 2024 — Perak facility is world’s first palm oil mill to adopt AI
Ours, relayed in The Edge Malaysia, 25 May 2026
Oil extraction rate (OER)
+1.17 pp§OER
17.85% → 19.02% out of the same fruit, on this mill’s own baseline.
Ours, relayed in The Edge Malaysia, 25 May 2026
Mill crew
66→31§HDC
53% fewer people running the mill. A headcount, not a wage saving.
Ours, relayed in The Edge Malaysia, 25 May 2026
Breakdown hours
12.21→3.08§BRK
Down 75%, monthly average. Ask us how we count a breakdown hour.
Ours, relayed in The Edge Malaysia, 25 May 2026
Payback
< 2 yrs§PAY
A projection against the retrofit capital.
What we installed
Eight stations at that mill.
Start with these three.
What each one decides, on live plant, every cycle — with the screen it decides it on.
01
Sterilizer recipe selection
Which cycle to run for the load in front of you, not the cycle the shift always runs.
02
Press mesocarp oil-loss prediction
Predicted loss per press, in the cycle — not in next week’s laboratory report.
03
Clarification VCT skimming
Skimming decisions measured at the clarification station instead of judged by eye.
One retrofit, one result. Stations, instruments and software went in together, and the figure above is what the whole retrofit delivered.
The source
Who wrote these
numbers down.
Our figures, presented at the International Palm Oil Millers Conference 2026. Joseph Tek Choon Yee, a former president of the Malaysian Estate Owners’ Association, was in the room and wrote them up in The Edge Malaysia.
The same figure, charted
Drawn from zero, so the gain
is the size it really is.
Gold is the gain.
Ours, relayed in The Edge Malaysia, 25 May 2026
Before · the mill’s own baseline17.85%
After · reported19.02%
OER · per centGold — the +1.17 pp movementAxis 0–20, linear · zero baseline, no truncation
points of OER at Minsawi Industries. Check it: 19.02 minus 17.85.§OER
The crew count, charted
Half the crew, drawn
from zero.
Gold is the posts that came out. It is a headcount at two moments, not a wage bill and not a saving.
Ours, relayed in The Edge Malaysia, 25 May 2026
Mill crew before66
Mill crew after31
Mill crew · people on the payrollGold — the posts the retrofit removedAxis 0–80, linear · zero baseline, no truncation
of the mill crew at Minsawi Industries. A headcount at two moments.§HDC
The breakdown hours, charted
Breakdown hours, on
their own axis.
A different unit from the crew count, so it gets its own scale.
Ours, relayed in The Edge Malaysia, 25 May 2026
Breakdown hours before · monthly average12.21
Breakdown hours after · monthly average3.08
Breakdown hours · per monthGold — the hours the retrofit removedAxis 0–16, linear · zero baseline, no truncation
of the breakdown hours, monthly average. Ask how we count a breakdown hour.§BRK
Measurement notes
One line per figure. Open a fold for how it was measured.
§OER
OER — +1.17 pp
Ours, relayed in The Edge Malaysia, 25 May 2026
One mill, before and after, on its own baseline.
How this was measured
- Provenance
- AIREI results, presented at IPOMC 2026: oil extraction rate from 17.85% to 19.02%.
- Basis
- Percentage points of oil extraction rate: 19.02 minus 17.85. Not “1.17% better”, not “6.6% better”.
- Comparator
- The same mill, before and after.
- Scope
- Minsawi Industries, Kuala Kangsar.
- Variance
- Ripeness at harvest and the hours from cut to press cap extraction. A mill buying its crop outside holds neither steady.
§HDC
Mill crew — 66 to 31
Ours, relayed in The Edge Malaysia, 25 May 2026
A count of people at two moments.
How this was measured
- Provenance
- AIREI results, presented at IPOMC 2026.
- Basis
- A headcount. Not an FTE average, not a wage cost, not a rate.
- Comparator
- The same mill, before and after — as with the OER figure.
- Scope
- Minsawi Industries, Kuala Kangsar.
- Variance
- Your shift pattern and contract mix shape how much of this is available at your site. A mill already running lean has less of it to find.
§BRK
Breakdown hours — 12.21 to 3.08
Ours, relayed in The Edge Malaysia, 25 May 2026
A monthly average, before and after.
How this was measured
- Provenance
- AIREI results, presented at IPOMC 2026: a monthly average from 12.21 hours to 3.08.
- Basis
- A monthly average of breakdown hours. Ask us how we count one.
- Comparator
- The same mill, before and after — as with the OER figure.
- Scope
- Minsawi Industries, Kuala Kangsar.
- Variance
- The maintenance regime underneath it. Instrumenting a badly maintained plant reports the fault in high resolution; it does not repair it.
§PAY
Payback — under two years
Ours, relayed in The Edge Malaysia, 25 May 2026
A projection against the retrofit capital.
How this was measured
- Provenance
- An AIREI forecast.
- Basis
- The time to earn back the retrofit capital, against the RM4–5 million The Star reported was invested.
- Comparator
- A forward calculation on the three figures above, plus inputs AIREI holds. Ask for them.
- Scope
- The Minsawi Industries retrofit, Kuala Kangsar.
- Variance
- Capital cost, crop price, throughput and uptime. Move any one and the number moves.
How to read it
Read the change,
not the absolute.
Absolute OER is set by how ripe the fruit arrives and how long it waited — a mill controls neither. What it controls is the ramp to the tank. That is where the +1.17 was won.
The install
You could not turn
off the mill.
Minsawi had a crop to process, so there was no commissioning shutdown. Sensors, actuators, control and network went onto live plant from August 2024.
The only window to stop the plant was seven hours on a Sunday. Everything else was done hot.
Ask us about your own crop calendar first. It decides whether a retrofit is possible at your site at all.
The Edge Malaysia, 30 Dec 2024, quoting AIREI CEO Surendran Kuranadan
For your process engineer
What you can
read yourself.
No form, no email
Open these now
- Smart Mill — the eight stations and what each one does
- Smart Palm Oil Mill Brochure 2026, page 3 (PDF)
- Unmanned AI FFB Grading — the specification
- AIREI AI Grading Brochure, page 2 (PDF) — the key features and the four grading tiers.
- The measurement basis behind these four figures
- Ask, and it comes with the periods, the definitions and the sign-off attached.
Coverage
Who else wrote it down.
Named outlets, real headlines, and a link to each original. Three languages.
- The Star Perak facility is world’s first palm oil mill to adopt AI 19 Nov 2024 · English
- New Straits Times AI can boost Malaysia’s palm oil productivity, cut labour dependency Nov 2024 · English
- Bernama Malaysian palm oil mills should adopt AI technology — Johari 19 Nov 2024 · English
- The Edge Malaysia When palm oil learns to think: the AI estate-mill frontier (Part 1) 25 May 2026 · English
- Buletin TV3 Kilang sawit AI pertama di dunia dilancar di Kuala Kangsar 19 Nov 2024 · Bahasa Malaysia
- Berita Harian Malaysia negara pertama dunia integrasi AI dalam kilang sawit Nov 2024 · Bahasa Malaysia
- Harian Metro Kilang sawit pertama integrasi AI Nov 2024 · Bahasa Malaysia
- Berita RTM Kilang proses sawit guna AI pertama di dunia Nov 2024 · Bahasa Malaysia
- Business Today Palm oil mills should adopt AI to reduce cost and increase revenue 19 Nov 2024 · English
- Asia News Network AI boost for palm oil production in world’s first smart mill in Malaysia Nov 2024 · English
- OFI Magazine Malaysia’s first palm oil mill using artificial intelligence launched Nov 2024 · English
- Asia Palm Oil Magazine Malaysia unveils the world’s first AI-driven smart palm oil mill Nov 2024 · English
Next step
The same question,
on your plant.
A site assessment tells you what your mill is losing today, where, and whether instrumenting it would change that.